PHOTO GALLERY: PAGE 2
THIS PICTURE SHOWS AN ACID TRUCK PUMPING 2000 GALLONS OF HCL ACID, DILUTED TO 20% STRENGTH DOWN THE WELL. HIGH PRESSURE OF 1500 PSI WAS APPLIED FOR ABOUT AN HOUR BEFORE THE FORMATION FRACTURED. NOTE THE CRUDE OIL IN THE WHITE TANK. THIS BECAME A VERY GOOD GAS & OIL WELL FOR OUR CLIENT.
OIL FREE FLOWING AFTER THE ABOVE ACID TREATMENT OF THE WELL. A PIT WAS DUG AND LINED WITH PLASTIC TO HOLD THE OIL. LATER THAT DAY A 100 BARREL TANK WAS SET.
