Commonwealth Energy Group

 

Photo Gallery 5:

Drilling rig mounted on trucks are used mostly in the formations down to about 3,000 feet.

The above media clip is of a air rotary drilling rig in operation over a borehole.

This is the beginning of a natural gas refinery site construction. The gas collected in the gasfield has been refined at this location designed for about 5mm BTU per day.

The plant is finished and in operation, cleaning capacity of about 5 million cubic feet of raw local gas per day.

 

The above video clip is a field demonstration of a freshly drilled high output gas well that also provided crude oil!
 
Copyright © Commonwealth Energy Group. All rights reserved.
Powered by Ewisoft Website Maker & eCommerce Website Design Software